Ahmedabad, also known as the ‘metro’ city welcomed its long waited metro project Phase-1 on 30th September 2022. While the 6.5 km section of East–West corridor was inaugurated on March 2019. The stations of Kankaria East, Sabarmati Railway Station, and Thaltej Gam are not yet ready. But before you travel, check the list of do’s and dont’s issued by Gujarat Metro Rail Corporation Limited for smooth metro travel: The Contactless Smart Token (CST) and Contactless Smart Card (CSC) have been issued for traveling. Although temporary paper ticket will be issued if both the above options are not available due to some technical error. But tickets can be booked as an individual, group, and tourist tickets as well. Children who are below 3 feet (90 cm)